Cabinet installation is not stacked wood, so the operation is standardized

Many renovation owners know that when decorating a house, kitchens and bathrooms should be the top priority of the renovation, as these areas are highly used, especially in the kitchen. However, some owners have neglected the most critical cabinet installations in the kitchen. It is generally believed that the whole cabinet installation is like a child playing with blocks, that is, putting together the parts of the whole cabinet. In this regard, the industry pointed out that the cabinet installation is not so simple, the whole process is to pay attention to many problems, there are many factors to consider. Such as the location of the water and electricity, the location of the switch socket, the location of the gas pipe installation, and so on.

Hydropower layout attention size

1. The height of the socket and other points should be as uniform as possible. Do not have too many heights.

2. The size of the wall should be as large as possible to facilitate the pre-buried measurement.

3. Dimensions should be as far as possible from the fixed wall, not from the surface where the actual size of the pipe well will change.

4, the label is difficult to identify clearly with text to add instructions, encounter special brand special specifications of electrical appliances, need to be specifically studied before the hydropower layout.

There are rules for getting on and off the water

1. Upper water angle valve: Located in the center of the sink cabinet, the interval between the hot and cold water angle valves is 15 cm and the height is 60 cm.

2. Sewer pipe: The ground drainage position is located in the middle of the hot and cold water angle valve. The wall drainage requires that the outlet pipe height not exceed 30 cm and is buried in the wall as much as possible.

3. The upper and lower water and sockets of the dishwasher or washing machine are reserved in the sink cabinet. The position is 15 cm away from the side panel of the cabinet on the side of the equipment, and the height is up and down with the sink. 4. The pipeline must be pre-buried at the location where the equipment is placed.

5, the refrigerator with ice-making function needs to set a water inlet near the refrigerator, the height is 60 cm.

6. Nakajima water is placed in the Nakajima sink cabinet, 20 cm from the back panel of the sink cabinet.

Socket (the height is the bottom of the socket bottom)

The spare socket on the countertop is 110 cm high.

1, the oven socket height of 70 cm, set in the middle of the back of the oven;

2. A spare socket should be reserved in the sink cabinet with a height of 60 cm.

3. The height of the disinfection cabinet socket is 60 cm, which is set in the middle position behind the disinfection cabinet.

4, imported gas stoves and some domestic gas stoves need to discharge sockets, the height is set according to the equipment below the gas stove, if the height of the drawer cabinet or oven is 70 cm, the height of the door cabinet or disinfection cabinet is 60 cm.

5. The height of the hood is 220 cm. If there are special circumstances, it can be set in the ceiling.

6, the external refrigerator socket is set at the back of the refrigerator, the height is 60 cm; the embedded refrigerator socket is set on the refrigerator cabinet, the height is according to the door space of the refrigerator cabinet, and the center is reserved. If there is no space above, it is set in the refrigerator cabinet. In the body, the height is arranged according to the cabinet next door.

8. The equipment socket of the base cabinet is placed in the center of the base cabinet, and is connected to the cabinet after the cabinet is installed. The hood of the hood is placed in the ceiling, and it is required to be marked with a fixed bracket on the ceiling for the installation of the hood.

Gas pipeline, flue pipe, lamp line, etc.

Installation must be more rigorous

1. Gas valve: If the gas stove is below the door opener or chest of drawers, it is placed in the cabinet with a height of 65 cm. If the equipment is under the gas stove, it should be placed in the cabinet next to the gas stove inlet valve. The layout of the next cabinet, such as the seasoning basket, height 65 cm, and 15 cm from the equipment cabinet, if the cabinet is less than 20 cm wide, skip the cabinet, put it in the cabinet next door, gas branch Should go against the wall or stick to the ground.

A gas cooker is equipped with a valve, and the domino cooker requires multiple valves.

2. The smoke exhaust hose is embedded in the ceiling and dragged to the vicinity of the installation opening of the hood.

3. The lamp line is centered behind the cabinet in which the lamp is installed. The height behind the base cabinet is generally 60 cm, and the height behind the cabinet is 190 cm.

4. If the lamp itself does not have a switch, it is necessary to reserve the switch loop control. The light switch in the cabinet can be set at the main switch of the door, and the light switch under the cabinet is placed near the wall and can be arranged side by side with the wall spare socket.

5. The shelf light line is reserved behind the shelf; the skirting board light line is pre-buried on the ground, 30 cm away from the wall. Chengdu Business Daily reporter Su Mingyu

[Scan the QR code below, pay attention to the WeChat public number "Jiuzhen cabinet network "; you can view the popular article " Rejected credit, otherwise it is really scary! ! 》 , want to communicate with peers can join the Jiuzheng building materials network cabinet exchange group]

Heat Shrinkable Tape

I System description:

Heat Shrinkable Tape is designed to protect the weld joint of buried or exposed steel pipelines and insulated pipeline. This sleeves are manufactured from high quality cross linked polyethylene material. Hot melt adhesive provides excellent adhesion with the surface of steel pipeline, PE coating. Meanwhile it forms a continuous and firm anti-corrosive system with the surface of the pipeline.

The Polyethylene Heat shrinkable Tape needs no primer nor patch closure and reduces application time and labour costs.

â…¡ Structure

The specification of the tape consists of three layers,

Adhesive: butyl rubber based hot melt adhesive

Film backing: Radiation crosslinked polyethylene

Interleaf:Antiadhesive Film Treated with Silicone

â…¢ Features

After heating, formed corrosion protection seal

Strong backing provides outstanding waterproofing effect

High chemical resistance. resists impact, abrasion and ultraviolet light.

Excellent resistance against cathodic disbondment, dielectric breakdown.

Simple Application

â…£ Physical Properties

· Product Data Sheet Total Thickness:40mil, 50 mil,60 mil ,65 mils.

· Width:50,100,150,300,400,500,800 mm

· Length: 10 m

· Tensile Strength:35 N/cm

· Elongation:400%

· Adhesion Strength to pipe:30 N/cm

· Application temperature: -10 -60 ℃

· Temperature resistance:-50 ℃ - 80℃

· Shelf Life: 12 months

â…¤ Application

No Special skills, equipments, patch closure nor primer are needed. Its superior flexibility provides easy and reliable application for irregular configurations of fittings, bends and elbows and small diameter of straight pipes

Wrap spirally the tape over foreign matters-free and preheated surface, beginning at least 25~50mm (1~2 ) onto pipe coating. Wrap the tape with enough tension to obtain conformability and with minimum 50% of overlapping, while removing the release liner. Warm the end part of the tape and press down firmly. Using a torch, start at the edge of the tape and heat circumferentially around the coated pipe.

Finish off by heating over the entire tape vertically to ensure a uniform adhesion and by using a roller or gloved hands to remove wrinkle and air.

VI. Technical Datas


HOT TAPE1

Heat Shrinkable Tape

Heat Shrinkable Tape, Shrink Wrap Tape, Heat Applied Tape

Jining Xunda Pipe Coating Materials Co.,Ltd , http://www.pipe-wrap.com