Three-point product seven-point installation cabinet installation preparation and process

In the decoration industry, there is such a saying "the cabinet is a three-point product, seven-point installation". It can be seen that for cabinets with customized products, installation is the last step and the most crucial step for cabinet consumption. Whether the cabinet installation is in place is not only directly related to the beauty of the cabinet, but also related to the daily use in the future. The installation of the cabinet is more complicated. Although the technical content is not too high, but the details are quite large, it is quite difficult to complete the work of each step to achieve the perfect display of the final molded product, so the quality of the cabinet can be installed on the cabinet products. The brand has a general understanding. The following small series will give you a detailed analysis!

ready

Choose the cabinet when the decoration starts.

For consumers, first of all, we must understand the installation time of the cabinet, in order to reasonably arrange the construction progress, and inform the cabinet manufacturers, and then agree on the installation time. According to the technical staff of the Cobo Boloni cabinet installation department, the installation of the cabinet must be completed after the hydropower transformation is completed, and the kitchen floor tiles and wall tiles are laid.

Relevant professionals suggest that consumers should be able to choose the cabinet at the beginning of the renovation. Before the hydropower transformation, the cabinet manufacturer should be allowed to make the first measurement. The purpose is to design the specific functions and layout of the cabinet. The water and electricity map requires the construction party to follow the water and electricity layout to facilitate future use. The second measurement after laying the tile is mainly to check the specific size of the cabinet. During this period, the cabinet manufacturer should fully understand the situation in the consumer kitchen and notify the installation department. For example, some people have excessive hardness of the tile. Professional rhinestones are needed to catch eye.

remind

Choose the big brand cabinet, agree to the installation terms

In recent years, the domestic cabinet market has developed rapidly. The reporter found that today, especially some small and unknown workshops on the market, they also manufacture cabinets under the banner of the whole cabinet. According to an industry insider, the small cabinet factory spent tens of thousands of yuan to buy some machines, such as cutting saws, punching machines, presses and other equipment, please come to several carpenters and workers, you can make cabinets. However, such cabinets are often not guaranteed in the selection of materials, let alone good after-sales service. Therefore, it is recommended that consumers choose the big brand, guaranteed cabinet brand, and it is best to buy in the formal large building materials market.

In addition, relevant experts said that because the cabinet consumption is often paid before the installation, it is necessary to pay special attention to protect their rights and interests during the contract signing and installation process. For example, if there are no relevant installation clauses in the contract, a supplementary agreement should be drafted on some important installation standards, and it is agreed that if the installation does not meet the requirements, the manufacturer must fulfill the obligation to repair, compensate for the loss or return the full amount. The installer comes to the door, and if it is first felt, it is a skilled worker who does not bump at work. After the installation is complete, any problems should be raised in time. Once the installation results are approved, any problems that arise in the future are after-sales services. In addition, the warranty period for cabinets is generally one year.

Process analysis

Generally speaking, the installation of the whole cabinet requires two installation technicians. After entering the cabinet, the cabinets will be installed in the order of the cabinets, cabinets, countertops, faucets, sinks, stoves and appliances. Need to be reminded that some cabinet companies' cabinets and countertops are not installed together, so three installations are required. When consumers supervise workers, they can observe whether the workers are skilled and whether the installation is wrong.

The first cabinet back cabinet hardware installation is heavy

Step 1 installation of the cabinet

Before installing the cabinet, workers should clean the kitchen floor to accurately measure the ground level. If the cabinet and the ground can not reach the level, the gap between the cabinet doors can not be balanced, the installation workers will use the level to measure the ground and the wall to understand the ground level, and finally adjust the cabinet level.

If the cabinet is L-shaped or U-shaped, you need to find the reference point first. The L-shaped floor cabinet extends from the right angle to both sides; the U-shaped floor cabinet first aligns the middle-shaped one-piece cabinet and then arranges the two sides from two right angles to avoid gaps. After the floor cabinet is placed, it is necessary to level the floor cabinet and adjust the level of the cabinet through the adjustment legs of the cabinet.

The connection between the cabinets is also an important step. Generally, four connectors are required to connect between the cabinets to ensure the tightness between the cabinets. In order to save costs, some brand-name manufacturers use poor quality self-tapping screws, which not only affects the appearance of the cabinet, but also locks the cabinet from one end, and the connection is not high.

Step 2 installation of the cabinet

After the cabinet is installed, the cabinet can be installed. When installing the cabinet, in order to ensure the level of the expansion bolt, it is necessary to draw a horizontal line on the wall. Under normal circumstances, the distance between the horizontal line and the table is 650 mm. Consumers can propose the cabinet and the cabinet to the installation workers according to their height. The distance between the adjustments is convenient for future use. When installing the wall cabinet, it is also necessary to connect the cabinet with the connecting piece to ensure the tight connection. After the cabinet is installed, the level of the cabinet must be adjusted. The level of the cabinet will directly affect the aesthetics of the cabinet.

Step 3 installation

At present, the countertops used by consumers are mostly artificial stone or natural stone countertops. The stone countertop is made of several pieces of stone. The bonding time, the amount of glue used and the degree of grinding will affect the appearance of the countertop. It usually takes half an hour to bond the countertops in summer and 1-1.5 hours in the winter. When bonding, use professional glue to bond and polish with a sander.

In addition, some cabinet manufacturers will install the countertops for a period of time after the installation of the cabinets and cabinets for the error caused by the decoration, and there will be a process of measuring the countertops in the middle.

Step 4 Hardware Installation

The basin, the faucet and the basket are also the highlights of the cabinet. When installing the hanging cabinet and the countertop, in order to prevent the wood chips from falling into the basket rail, cover the basket with the covering to avoid affecting the future use. The installation of the basin involves the problem of launching water. When installing the cabinet, the installation of the water will be done by means of on-site opening. The hole will be drilled according to the size of the pipe with a professional punch. The diameter of the hole should be at least 3 to 4 mm larger than the pipe, and the hole should be opened after punching. Partly sealed with a sealing strip to prevent water from swelling and deforming at the edge of the wood, affecting the service life of the cabinet.

In order to prevent water seepage in the basin or the water, the connection between the hose and the basin should be sealed with a sealing strip or glass glue. The hose and the sewer should also be sealed with glass glue.

Step 5: Appliance installation

The installation of the embedded electrical appliances in the cabinet only needs to open the power supply hole on the spot. However, the power supply hole cannot be opened too small to avoid disassembly in the future.

In order to ensure the use and smoking effect when installing the range hood, the distance between the range hood and the cooktop is generally between 750 and 800 mm. When installing the range hood, it should be aligned with the left and right sides of the cooker. The height can be adjusted according to the actual situation. The most important thing to install the cooker is to connect the gas source. To ensure that the gas inlet is not leaking, the gas source should be sent by the natural gas company. If it is installed by the decorator, the gas company should be allowed to check the air leak.

Step 6 adjust the cabinet door

The door panel is adjusted to ensure that the door gap is even and horizontal and vertical. The floor depth is generally 550 mm and the wall cabinet is 300 mm. Consumers can also adjust according to the actual situation. After adjusting the door, the workers should also clean up the garbage left when installing the cabinet to ensure the cleaning of the owner's kitchen.

[Scan the QR code below, pay attention to the WeChat public number "Jiuzheng cabinet network "; you can view the popular article "Go is not a cabinet, but a comfortable life... " , want to communicate with peers can join Jiuzheng building materials cabinet exchange group】

PET polyester nonwoven long fiber Geotextile include fabrics for separation and stabilization, subsurface drainage, filtration and cushioning. The nonwoven PET geotextiles are applied in roads, embankment, airfields, landfills and sports construction projects. Nonwoven PET geotextile can be easily cut to fit any shape for your project. The nonwoven PET geotextile features high tensile strength and density, along with excellent physical and hydraulic properties. 

long fiber geotextile

nonwoven geotextile

Applications:

While the nonwoven fabric can be used in almost any stabilization,separation or cushioning application,they are most commonly used in areas that also require filatration.The non woven design of the material provides a higher rate of flow through,making it easier for water to pass through the material.Some commen uses of the material includes the following:
Road stabilization applications
Roofs
Civil applications 
Railway work
Landfill lining
Trenches
Dams
Fitration under rip rap and rocks
Environmental applications
long fiber geotextile application

Technical Specification Of Filament Spunbond Needle Punched Geotextile

technical data for long fiber nonwoven geotextile


Pet Long Fiber Nonwoven Geotextile

Pet Long Fiber Nonwoven Geotextile,Polyester Nonwoven Geotextile,Polyester Geotextile Fabric,Nonwoven Geotextile Fiber

Shandong Tianhai New Materials Engineering Co., Ltd , https://www.chinatinhy.com