Net friend's home: Puncha (Buddha in mind)
Flooring:>>> Korno Rhine Sunshine
The first step to measure the size of the field
The second step inspection
Moistureproof mat
Batten
Step 3 Prepare for installation
For the final preparation of the pressure layer to be prepared in advance, [the master said: Although the layer is the last step in the installation of the floor, but wait until the installation of the floor and then drill will produce a lot of gray, so to work before installation, easy to clean].
Make wooden town <br> Note the box around the master, listen to the delivery driver said that this is a horse planner made by himself. Then I asked the master to understand that this box was not only portable, but also that a lot of sawdust was stored in the box. It is very good!
Paving mat
Connected with glue and soon became a white ocean
Step 4 Install Floor
Plane the first board
Kano special glue
Start shop
A glue and a fixed, action and unrestrained
The episode one, the color is not coordinated, the master will choose it to put aside.
Step 5 Install the baseboard
Fixed skirting things
Nailed to the wall
Nail baseboard
Measure the part to be removed
Cutting
Cut nails after cutting
Tear film
Corner yin and yang corner
Yangjiao
Inside corner
Qi family intimate tips:
The inside corner of the wall refers to the recessed corner (also called inside corner), such as the angle between the top surface and the surrounding walls.
The corner of the wall refers to the protruding corner (also known as the outer corner). Such as the angle between the window hole and the wall.
On the edge, it can only be fixed with special tools. (L+L type tool)
Loading bars
Preparing the master to do a very detailed, clean the dust with a brush
Cutting strip
Installing the batten
The master finally helped us clean up, and advised us not to persuade them.
Finally, according to the actual situation of the use of materials back less and less
final effect
Shop floor window