The building is good or bad, and the foundation is very important. In the renovation, the more front-end processes, the quality of the better will affect the quality of the entire decoration. So today, let us talk about the nine main points of construction of a mason.
>>> Links: How to brush latex paint and detailed process analysis
The first point: During the renovation, it is inevitable that you must knock and hit, pile up and masonry. When knocking and striking, be careful not to knock on the bearing wall. For the newly built wall, in order to ensure the firmness of the new wall, it is recommended that you Above the door opening of the wall, prefabricated beams are placed.
The second point: In order to ensure that the wall tiles are firmly bonded, the wall tiles should be fully immersed before soaking and soaked until there is no bubble.
Three points: In order to prevent emptying the floor tiles and affecting future use, when laying floor tiles, the dry cement mortar layer should be thick enough, generally about 3 cm. ...... >>more
Point 4: In order to ensure that the tiles are secure on a smooth wall, the original smooth wall should be treated as a cut.
Point 5: In order to prevent leakage of bathroom and balcony water to the room, it is recommended to install a water barrier at the junction, and to do a waterproof treatment. In addition, in order to prevent the kitchen and toilet water from leaking out, the floor of the kitchen and bathroom is preferably 20-30 mm below the other floors. ...... >>more
Point 6: In order to ensure that there is no accumulation of water on the ground, the tiles should be pressed against the floor tiles. ....... >>more
Point 7: When tiling, in order to improve the appearance of the sun, the raised corners should be treated with spelling angles.
Point VIII: In order to prevent the cracking of the new and old walls at the lap joint, the new wall connected to the load-bearing wall and the partition wall shall be knocked out of the protective layer to expose the reinforcing steel. The reinforcing steel with the length of not less than 1200mm shall be firmly welded and used as the tension bar and the wall. Connected, linked to the barbed wire interface, and plastering to ensure the stability and solidity of the wall, try to avoid cracking.
Point 9: When tiling, the bricks will inevitably be contaminated with cement lime and the like. In order to prevent contaminated wall tiles from being contaminated, the cleaning is not clean, and it must be cleaned immediately after the tiles are finished.
Wall Construction Cement Interior Finishing Lacquer Paint House Decoration Renovation Partition Doors Kitchen Wall Tiles Bathroom Tiles Bathroom Tiles Bathroom Doors Bathroom Wall Tiles Toilet Partitions Toilets Waterproof Bathroom Tiles Tiles Tiles Kitchen Tiles Balcony Tiles
Roll Up Door Servo Motor,Automatic Roller Shutter Door Opener,Roller Shutter Door Servo System,Glass Sliding Door Motor
Shenzhen Hongfa Automatic Door Co., Ltd. , https://www.hffastdoor.com