Wood floor construction process

>>>Links: Problems with wood flooring

Wood floor decoration practices:
1. Paste wood floor:
On the concrete structure layer is leveled with 15 mm thick 1:3 cement mortar. Most of the current use of polymer adhesives, the wood floor directly paste on the ground.
2. Real wood flooring:
The wood floor of the real shop floor type adopts a trapezoidal section wooden joist (commonly known as wooden mallet). The distance between the wooden joists is generally 400 mm, and some light materials can be filled in the middle to reduce the empty drum sound when people walk and improve the insulation. Thermal effect. In order to enhance the integrity, the wooden joists are laid on the nail floor and finally on the wool floor, they can be connected or bonded to the wooden floor.
At the junction of a wooden floor and a wall, use a skirting board to cover. To distribute moisture, ventilate holes in the skirting board.
3. Overhead wood flooring:
The overhead wooden floor is a ridge wall that is first built on the ground and then installed with wooden joists, wool floors, and floor coverings. Due to the lower height of family homes, such overhead wooden floors are rarely used in home decoration.

Process flow:
1. The paste construction process is:
Grass-roots clean-up → brushing primer → elastic wire, leveling → drilling, installing embedded parts → installing wool floor, leveling, planing → nailing floor, leveling, planing → nailing baseboard → planing, sanding → paint → on wax.
2. Strengthen the composite floor construction process:
Clean the ground floor → lay the plastic film floor mat → paste the composite floor → install the skirting board.
3. The actual paving construction process is:
Grassroots cleanup→elastic line→drilling installation embedded part→ground moisture proof,waterproof treatment→installing wooden keel→mat insulation layer→bullet line, nailing wool floor→leveling, planing→plywood flooring, leveling, planing→installation Skirting → planing, sanding → paint → waxing

Construction points:
1. Install the floor keel before installing the floor, and then pave the wooden floor.
2. The installation method of the keel: It should be embedded on the ground first to fix the wooden keel. The embedded parts are bolts and lead wire. The distance between the embedded parts is 800 mm, and it is drilled from the ground.
3. The installation method of wood floor: solid wood floor should have a base panel, the base panel uses a large core board.
4. After the floor covering is completed, the surface is planed and planed with a plane, the floor surface is cleaned, the floor paint is applied, and the polish is applied to the wax.
5. After all wooden floors have been transported to the construction site, they should be unpacked and stored in the room for more than one week so that the wood floors can be used in accordance with the room temperature and humidity.
6. The wooden floor should be selected before installation, removing defective products with obvious quality defects. The same pattern of color patterns spread in the same room, there is a slight lack of quality but does not affect the use, can be placed on the bottom of the bed, cabinets and other furniture to use, the thickness of the same room must be the same. At the time of purchase, it should be purchased at the expense of a 10% increase in actual paving area.
7. The keels of wood flooring should be made of pine, fir and other non-deformable tree species. The back of wooden keels and skirting boards should be treated with anti-corrosion treatment.
8. Paving solid wood floors should be avoided under heavy rain, rainy weather and other climatic conditions. It is best to keep the indoor temperature and humidity stable during construction.
9. The wooden floor in the same room should be finished at one time. Therefore, sufficient auxiliary materials should be prepared, and the finished product should be protected in time to prevent oil pollution, juice, and other contaminated surfaces. The glue that has been squeezed out during installation must be wiped off in time.

Precautions:
1. Laminated flooring of wooden floor should ensure that the cement mortar floor can not be sanded or cracked, and the ground floor must be cleaned.
2. Grass-roots unevenness applies cement mortar leveling and paving wood floors. The base layer moisture content is not more than 15%.
3. When glueing wooden floor glue, make it thin and even. The height difference between two adjacent wooden floors does not exceed 1 mm.