First, the use of special tools plug block: for the size of a unified expansion joint; knock block: the installation of the necessary lock the floor, uniform force, to prevent damage to the lock and slot; jig saw: used to dig fill the floor; In addition to plastic flat shovel: used to remove rubber, so as not to damage the floor surface; feeler feet: used to detect floor installation gap and measurement of door gap; level ruler: used to detect the level and acceptance of installation unevenness; wet and dry ball thermometer: use Measuring indoor temperature and humidity matching installation parameters).
Second, moisture-proof measures should be rigorous and professional: mats can not be overlapped, the connecting part should be sealed with plastic strips, wet places covered with plastic film and a 200mm lap.
Third, in accordance with the provisions of the program to measure the level of the ground, the vertical angle of the corner, the strength of the formation, the gap between the gap in order to make the installation more accurate.
Fourth, the installation of the baseboard must be regulated: 2 sections must be made with a 45-degree section, and a 45-degree section must be reserved for vertical joints; the nails must be removed when nailing the baseboard. Substantive.
5. The product materials are planned strictly. Products larger than 300mm can be used to minimize the truncation of the remaining products to less than 200mm.
Six, to maintain the installation of products when the tension between the board evenly distributed, no difference, in order to ensure that the floor as a whole float, reduce the possibility of cracks;
Seventh, the upper and lower sizing is sufficient and uniform, and the internal glue of the lock is full and full of no diarrhea. This is closely related to the physical properties of the glue and construction techniques, directly affecting the quality of floor installation.
VIII, laying a solid, no abnormal sound, no damage to the appearance of the product, the installation of accessories, accessories, installation accuracy and other comprehensive level.
Second, moisture-proof measures should be rigorous and professional: mats can not be overlapped, the connecting part should be sealed with plastic strips, wet places covered with plastic film and a 200mm lap.
Third, in accordance with the provisions of the program to measure the level of the ground, the vertical angle of the corner, the strength of the formation, the gap between the gap in order to make the installation more accurate.
Fourth, the installation of the baseboard must be regulated: 2 sections must be made with a 45-degree section, and a 45-degree section must be reserved for vertical joints; the nails must be removed when nailing the baseboard. Substantive.
5. The product materials are planned strictly. Products larger than 300mm can be used to minimize the truncation of the remaining products to less than 200mm.
Six, to maintain the installation of products when the tension between the board evenly distributed, no difference, in order to ensure that the floor as a whole float, reduce the possibility of cracks;
Seventh, the upper and lower sizing is sufficient and uniform, and the internal glue of the lock is full and full of no diarrhea. This is closely related to the physical properties of the glue and construction techniques, directly affecting the quality of floor installation.
VIII, laying a solid, no abnormal sound, no damage to the appearance of the product, the installation of accessories, accessories, installation accuracy and other comprehensive level.