Many consumers are not very familiar with and understand the specific terms of the contract text. In actual use, due to the omission of certain terms, it may also cause disputes with the decoration company. Therefore, pay special attention to the following items before signing a contract for renovation:
First, the main body of the contract is not clear: the contract should first fill in the names of Party A and Party B and contact methods. Here we should pay attention to a detail. Many companies only cover one chapter with company name. You must ask the decoration company to fill in the content and check it.
You should also pay attention to the name of the fitting company that signed the contract, and whether it is the same as the name of the company that was stamped on the contract. If they do not match, you must ask the relationship between the two and indicate on the contract. The reason for this is that in the event of a dispute, there must be a relatively complete legal person registration status for the decoration company to prepare for future complaints or prosecutions, eliminating the hassle of inquiries and being able to find the exact responsible person.
Second, the concept of supervision is vague: The contract stipulates that engineering supervision can be implemented. “Engineering supervision†refers to the supervisor’s entrustment of consumers, that is, Party A, to supervise and manage project construction projects. “Supervisor†refers to a company that has acquired a qualification certificate, a legal person, a supervisory office, or a company. From this we can see that as an engineering supervisor, his identity is independent of the decoration company. Some home improvement markets promise to provide consumers with free supervision. The effectiveness of its supervision over the quality of decoration works and its role remain to be discussed.
Third, the rights and obligations are unclear: The contract stipulates the work that should be done by both parties to ensure the smooth progress of the project. For consumers, pay particular attention to the following items specified in the contract: To ensure the safety of buildings, indoor load-bearing structures cannot be removed. If the non-load-bearing structures or equipment pipelines of the original buildings are demolished and changed, they shall be responsible for going through the corresponding approval procedures for the housing management department. If during the construction period the room is still used by consumers, the consumer shall be responsible for the protection of the construction site and fire protection. Without hampering the normal operation of the construction team, consumers can check the progress and quality of the project at any time.
4. Addition and deletion of items did not join the contract: At present, during the actual performance of the renovation project, there are many phenomena in the increase of construction projects. Some decoration companies began to intentionally make the quotation very low, and then gradually increase after the start of the work, so that consumers can no longer find another decoration company, they had to agree with their requirements, making the final decoration far beyond the initial price, so consumption When the contract is signed, if it is understood by multiple parties, and then it is reasonable to combine the expenditure with the house area and construction project on its own, the construction project should be changed cautiously. If during the construction process, due to the increase or decrease of construction projects or other factors, the original contract must be changed, consumers and decoration companies must agree and sign a written change agreement, related to the duration, project budget and Drawings must be changed and signed by both parties.
V. Material supply is not confirmed: In view of factors such as decoration materials brand and price, most decoration companies currently recommend that consumers choose “Party B, part of the materials, Party A provides some materialsâ€, that is, the second specified in the contract. Way to construction. In terms of material supply, both parties should bear certain responsibilities. Consumers are obliged to provide materials according to the agreement, and ask the decoration company to provide them.
Construction contract decoration decoration company interior decoration door price housing decoration find decoration company okay
Fused Silica Axicons,mexican mask ,axicons, acxion diet pills,axicon lens, axicon rainbow window suncatcher, axicon pills
Our company can produce a variety of specifications, radius, different base materials of flat convex Spherical Mirrors flat convex spherical Mirrors, flat concave spherical mirrors, double convex spherical mirrors, double concave spherical mirrors, meniscus spherical mirrors and other ordinary spherical mirrors. Special spherical mirror can also be processed, such as: achromatic spherical mirror, aspheric surface and spherical mirror group.
Materials: optical glasses such as flint glass, ultraviolet fused quartz and infrared fused quartz, as well as optical crystal materials such as calcium fluoride (CaF2), germanium (Ge), Zinc selenide (ZnSe) and silicon (Si)
Focal length: ±5mm -- ±1000mm±1%
(Germany TIROPTICS OPTOMATIC2000 test)
Outer circle: 4mm -- 200mm±0.1mm
Center thickness tolerance: ±0.1mm
Center deviation: 3-5 points
Surface accuracy: /2@
Surface quality: 40/20
Effective diameter: 90%
Plating film: according to customer requirements can be coated
In addition, we have more than a thousand kinds of standard products, and some of the standard products in stock to meet your needs
Bandwidth Of Low Pass Filter,Bandwidth Of Photodetector,Abandwidth Equation,Bandwidth Low Pass Filter
Gold Dragon Optics Electronic Technology CO.,Ltd , https://www.golddragon-optics.com