Here we introduce the construction process that is prone to occur in the early stages of renovation. The situation is not in place, violations, etc. It seems to be as small as sand, but in reality it is endless.
Question 1: The workers did not properly handle the fire line, ground line, and zero line. On the surface, a yellow line and two blue lines do not know the ownership of each line, and there are great security risks.
Supervisor explanation: Does not meet acceptance standards. According to regulations, the fire line is red, the ground line is a suit, and the neutral line is blue. If no distinction is made during the initial construction, it will give future work, for example, when other people change sockets, causing troubles and problems.
Question 2: Bare wire violations, exposed wires. In addition, the wire tube was too close to the water pipe.
Supervision explained: The Decoration Management Regulations stipulate that the exposed threads must be wrapped with insulating tape to prevent workers from getting electric shock during construction. In addition, wire and pipe should be at least 20 cm apart.
Question 3: There is no additional line box at the time of branching, and the PVC line pipe is not fixed.
Supervision explained: In the circuit reconstruction in the ceiling, the distribution line must be added to the distribution box; Secondly, the PVC line pipe should be fixed at a distance of 50 cm each point, otherwise the wire is easy to disorderly swing, to increase the difficulty of installing the lamp in the future. In addition, a hose is required between the distribution box and the corresponding ceiling fixture.
Question 4: The PPR tube is not fixed to the top surface and is too close to the bulb. In addition, there is water seepage around the PVC toilet hose.
Supervisor explained: The PPR pipe must be fixed on the top surface. According to regulations, a point should be fixed at intervals of 50 cm. Second, if it is too close to the light bulb, there is a danger that the tube will be roasted. In addition, before the construction, it is necessary to ensure that the toilets of the upstairs households are qualified for closed water acceptance.
Question 5: During circuit reconstruction, workers grooved the wall horizontally to bury the pipe.
Supervisor explained: In accordance with the management methods for building decoration, in the process of interior decoration, it is not allowed to slot horizontally on the load-bearing wall, and it is not allowed to cut the steel bars in the load-bearing wall, because this will destroy the main structure of the wall and shorten the life of the building. .
Question 6: Workers accidentally leaked water pipes.
Supervision explanation: Before construction, you must first check whether there is any marking line on the ground, such as 'Don't strike inside the line', to avoid breaking the underground pipeline. In addition, during construction, attention should be paid to keeping the water in the pipe. Once it is broken, problems can be discovered in time. If the total valve is opened when it is completed, it is found that the pipe is leaked and the loss will be greater.
Hydropower renovation decoration interior decoration socket home bathroom ceiling bathroom door
High Precision Optical Glass Window
Windows are optical glass with ground and polished faces that are relatively parallel.They are used to isolate two physical environments while allowing light to pass.Windows made of BK7 material have high transmission in the visible spectral region, do not scratch easily, do not degrade under normal operating environment and hence do not need any special precaution or treatment. Anti-Reflective Coating will provide higher transmission.
China Star Optics offers all types of windows made from different materials. Such as N-BK7, Fused silica, sapphire,CaF2, Silicon, Borofloat, high borosilicate glass and other optical glass supplied by Schott and Chinese CDGM are available upon request.
Windows at shape of round,quadrate, triangular or other polygonal are also available upon request.In addition, we provide a variety of single layer or multiplayer anti-reflecting coating,HR,PR coatings on Optical Windows.
Specification of our optical windows as follow:
*Material:high borosilicate glass, BK7,UV-grade fused silica (JGS1) or other optical crystals materials
*Length tolerance:+/-0.01
*Width tolerance:+/-0.01
*Center thickness tolerance:0.005mm
*Surface quality:80-50 to 10-5 Scratch/Dig
*Surface flatness:<lambda to lambda/20
*Parallelism<=1min -- 2sec
*Clear Apenture:80% -- 100%
High Precision Optical Glass Window,High Purity Silica Windows,Optical Round Window,Standard Optical Windows
China Star Optics Technology Co.,Ltd. , https://www.csoptlens.com