Suzhou Family Home Decoration Decoration Contract Demonstration Text
Employer (abbreviated as Party A):_______________
Contractor (B): _______________
According to the "Contract Law of the People's Republic of China", the "Construction and Installation Project Contract Regulations", "The People's Republic of China Consumer Protection Law," "The People's Republic of China Price Law," "Suzhou City, Protection of the Legal Rights of Consumption Regulations," People’s Republic of China The Ministry of Construction (1997) No. 92 of the "Trial Measures for the Management of Home Decoration" and other relevant laws and regulations stipulate that in order to protect the legitimate rights and interests of both parties, the two parties shall reach the following agreement in accordance with the specific conditions of the project and shall abide by them.
I. Overview
1. Party A’s decorated housing is legally resident.
Party B is an enterprise legal person that has been approved by the municipal administration for industry and commerce and has been examined and approved by relevant departments of the Municipal Construction Committee as having a Civil Decoration "Qualification Certificate."
2. Decoration construction site: __ District (County)____________ (Village)___________________________.
3, housing structure: _____ room type ____ room _______ sets, construction area ___ square meters.
4. Decoration construction content: For details, see Attachment 1 "Construction Construction Contents Table".
5. Contracting methods: _____ (including contracted materials, contractors, and partial contracts).
6, the total price: ¥ ____ yuan, capital (RMB): _____
among them:
Material fee: ______, labor cost: ______
Management fee: ______, design fee: ______
Garbage removal freight: ______, tax (3.41%): ____
other fee:______
With the approval of both parties, the contents of the construction shall be changed, and part of the project money shall be changed according to actual conditions.
7. Duration: Starting from ____________, _________, _______________, ____________, ___days.
Second, on the material supply agreement:
1. Materials provided by Party A: For details, see Attachment II, "Party A Provides Materials and Equipment Table".
The materials and equipment that Party A is responsible for purchasing and supplying shall be qualified products that meet the design requirements and shall be delivered to the site on time. Party B shall go through the acceptance procedures. If Party B's materials or equipment are subject to quality problems or specification differences, Party B shall promptly submit to Party A written submissions. Party A still indicates that it is used, and the responsibility for the project losses shall be borne by Party A. After the materials supplied by Party A arrive at the site, Party B shall be responsible for safekeeping after acceptance by Party B. Party B may receive the storage fee of Party A's provided materials. The rates shall be agreed by both parties. Party B shall be responsible for compensation for losses caused by improper storage.
2. Materials provided by Party B: For details, please refer to Attachment 3 “Main Material Quotation Sheetâ€.
3. The decoration materials and equipment purchased by Party B for Party A shall be used in the residential decoration as stipulated in this contract, and shall not be used for other purposes without the consent of Party A. If Party B violates this provision, it shall compensate Party A twice the amount of the misappropriation materials and equipment price.
4. Materials and equipment supplied by Party B shall not be used if they do not meet the quality requirements or the specifications are different. If it has been used, Party B shall be responsible for the losses caused to the project. If the materials and equipment provided by Party B are inferior products, they shall be compensated to Party A twice as much as the materials and equipment.
Third, the project quality and acceptance of the agreement:
1. This project implements DBJ08-62-97 "Technical Specification for Residential Building Decoration Engineering", DB31/T30-1999 "Residential Decoration Acceptance Standard" and other local standards and quality assessment acceptance standards formulated by the municipal construction administrative department.
2. The project is designed and constructed by ___.
3. The quality of the materials and equipment provided by Party A will be unqualified and affect the quality of the project. Party A shall bear the rework costs and the construction period will be postponed.
4. Due to the quality accident caused by Party B, Party B shall bear the cost of rework, and the duration shall not change.
5. During the construction process, Party A shall contact Party B in advance when designing modification opinions and adding or removing project items. After signing the “Project Change Sheet†(see Annex for details), the construction of the project can only be carried out by This influences the completion date of both parties A and B. Where Party A personally negotiates with the workers all the consequences of altering the construction content, Party A shall be responsible for causing losses to Party B, and Party A shall compensate.
6, project acceptance.
Both Party A and Party B shall go through the inspection and acceptance formalities of the concealed and intermediate works in a timely manner. Party A shall not participate in the inspection and acceptance on the date set by the appointment. Party B shall organize the inspection and acceptance by Party A. Party A shall acknowledge it. Afterwards, if Party A requests reinspection, Party B shall conduct the retest as required. If the re-inspection is qualified, the cost of re-inspection and rework will be borne by Party A, and the duration will also be postponed.
7. Completion of the project: Party B shall notify Party A of acceptance within three days in advance. Party A shall organize the inspection and acceptance within three days after receiving the notice, and go through the procedures for inspection and acceptance handover (for details, please refer to the appendix “Project Quality Acceptance Checklistâ€). If Party A cannot organize inspection within a specified time, Party B shall notify Party B in a timely manner and set an acceptance date. In case of acceptance through completion, Party A shall acknowledge the original completion date and bear Party B’s care costs and other related expenses.
Fourth, related to production safety and fire safety agreement:
The description of the construction drawings provided by Party A and the construction site shall meet the requirements for fire prevention and accident prevention, which mainly include the unimpeded and qualified electric lines, gas pipelines, tap water and other pipelines. Party B shall take necessary safety protection and fire prevention measures during construction to ensure the safety of operators and neighboring residents, and prevent accidents such as clogging of pipelines, leakage of water, power outage, and destruction of articles of neighboring residential houses. In the event of the above-mentioned circumstances, Party A's responsibility, Party A's responsibility and compensation; belongs to Party B's responsibility, Party B is responsible for repairs and compensation.
Fifth, the project price and settlement agreement:
1. The payment method of the project is listed in the following table:
Payment time | Payment percentage | Amount | |
Recognition of budget design | The date of signing the contract | 1,000 yuan, deducted on the second payment | |
After signing the contract | Two to five days before construction | 65% | |
in construction | More than half of the progress | 30% | |
Completion acceptance | The same day | 5% | |
Increase project | Signing the project change form | 100% |
Note: If the tangible market for decoration works is otherwise stipulated, it may be handled in accordance with market regulations.
2. Project Settlement: Please refer to Appendix 6 “Project Settlement Statement†for details.
3, the project warranty period of one year. All construction costs must be settled. Both parties A and B can sign the “Project Warranty†(see Annex 7 for details), and the warranty period starts from the date of acceptance of the completion certificate.
4. Both parties shall issue receipts for payment transactions, and an invoice must be issued at the end of construction.
Sixth, other matters
1. Party A's work:
(1) Party A shall provide Party B with the ____ copies of construction drawings or practices approved by the realty management department one day before the commencement of work, and Party B shall perform on-site delivery to Party B. All vacated or partially vacated houses to clear obstacles affecting construction. Measures shall be taken to protect furniture, furnishings, etc. that are left behind in houses that can only be partially vacated. Provide Party B with the necessary conditions for water, electricity, etc. required for construction, and explain the precautions for use.
(2) Doing a good job of coordinating the use of common parts and operations and affecting the relations between neighbors during construction.
(3) If it is really necessary to dismantle the original building structure or design pipeline, it shall be responsible for going through the corresponding examination and approval formalities with the local housing management department or property management department and bear the relevant expenses.
2. Work of Party B:
(1)Participate in construction drawings or practices organized by Party A to explain the site.
(2) Designate ____ as Party B's site representative and be responsible for fulfilling the contract. Organize construction according to requirements, guarantee quality, quantity, complete construction tasks on schedule, solve all matters that Party B is responsible for, and Party B shall approve their actions. In case of replacement of personnel, Party B shall promptly notify Party A in writing.
(3) The original building load-bearing structure and various common equipment pipelines shall not be arbitrarily removed without the consent of Party A and the approval of the local housing management or property management department.
VII. Liability for breach of contract:
1. Party A shall compensate Party B for losses due to work stoppages or work stoppages due to Party A's reasons for delaying the start of work or stop work. Each time a work stoppage or work breaks, Party A shall pay Party B_____; Party A fails to pay as agreed in the contract. , Every overdue day, according to __% of overdue payment of liquidated damages.
2. Due to the overdue completion of Party B's reasons, Party B shall pay Party A's breach of contract damages according to ___% of Party A's payment once each one day expired.
3. Party A did not go through relevant formalities and forced Party B to dismantle the original building load-bearing structure and shared equipment pipelines. Party A's losses and accidents (including fines) were responsible and responsible for Party A's losses.
4. Party B shall arbitrarily dismantle and renovate the original building load-bearing structure or shared equipment pipeline. The resulting losses or accidents (including fines) shall be the responsibility and responsibility of Party B.
Eighth, dispute handling methods:
1. When there is a dispute between the two sides of the project quality, with the text of this contract and the unified invoice issued by the construction company, you can ask for mediation from the Home Decoration Committee of the Suzhou Architectural Decoration Association, or to the administrative department or consumer of the district or county where you are located. Association vote.
2. When the parties are reluctant to resolve through negotiation or mediation, or if consultation or mediation fails, they can be directed in accordance with this contract.
Villa design entrance decoration decoration design residential home decoration housing
Specification:
Name | Brass bath spout chrome plated round design water saving spout |
Material | Brass, Chrome |
Function | Cold and hot water mixing |
Usage | Bathroom equipment |
Guarantee | 5 years |
MOQ | 50 pieces |
Package |
Inner packing: bubble package,cloth bag, white or color craft carton Outer packing: kraft carton Can be designed by customer |
Plating thickness |
The chromium layer is 0.25-0.45μm, nickel layer is 7.5-9.5 μm |
Shipping terms |
FOB Jiangmen or EX-Work |
Delivery time |
15-30 days after receiving deposit. |
Payment | T/T |
Round Brass Spout,Brass Tub Spout,Round Brass Long Spout,Round Solid Brass Spout
KaiPing HuiPu Shower Metalwork Industrial CO,LTD , https://www.hp-shower.com