(1) The floor wall of the kitchen and bathroom should not be higher than the indoor side or hall floor, preferably 10-20mm lower than the indoor wall (to prevent running water from overflowing).
(2) Before the floor is affixed, the ground wall water test (discharge) should be made first, and the anti-seepage and plugging work should be done well.
(3) The slope of the tile stone inlay with drainage requirements should meet the drainage requirements. The floor tile with floor drain should be covered with flood water (a kind of extremely steep slope). The direction should be tightly connected to the floor drain and floor drain.
(4) Use a small hammer to strike all the ground on the ground. There must be no empty drums. The floor is not allowed to be plastered with heavy materials such as granite and marble before it is calculated.