How many DHGJ-4-50/170 multi-tube type trolley wire installation accessories?

Shanghai Chaodian Electric Technology Co., Ltd. is one of the few production-oriented enterprises in the Shanghai metropolis. Choosing a tidal palace is a matter of choice. The following is a brief explanation of the installation accessories for the multi-barrel type trolley wire:

DHGJ-4-35/140 multi-stage tube type trolley wire installation accessories No. Attachment Name Applicable DHG Model Applicable DHGJ Model 1 Hanger GXJ JXJ 2 Fixing clip GGJ JGJ 3 Connecting clip GLJ JLJ 4 Cap GDM JDM 5 Puller FQY FQY 6 Bracket FZJ FZJ 7 Top power supply GGQT JGQT 8 Intermediate power supply GGQM JGQM 9 Power supply section GGD JGD 10 Bell mouth GDX JDX 11 Thermal expansion compensation section GPZ JPZ 12 Synchronizer FTB FTB
DHGJ-4-35/140 multi-pipeline type product line

DHGJ-4-35/140 multi-stage pipe type trolley installation precautions Sliding line installation:

1) Determination of mounting position a. Close to the drive position and install on the same side of the electrical equipment.

b. Keep away from the violent vibration area and try to avoid the source of the cream warm.

c. Pay attention to the convenience of maintenance.

2) Select a suitable suspension method a. Select the appropriate type and size of the suspension bracket according to the site conditions;

b suspension spacing standard length 1200mm. Up to 20000mm;

3) Installation Precautions a. According to the installation diagram, determine the position of functional sections such as the power supply section and the expansion section, and number them according to the installation location.

b. Install the first slide. It must be suspended by a fixed suspension to serve as a benchmark for alignment across the board.

c. The first slide conduit should be adjusted to have a parallelism of less than 1.5mm/1000mm with the centerline of the running track of the electrical equipment. The subsequent installation of the slide wire ensures the straightness of the first slide and the operation of the electrical equipment. The straightness of the track is not more than 1.5mm/1000mm.

d. For the DHGJ slip line must be effective to ensure a good grounding performance of each slip line.

e. After the installation is completed, it should be rechecked on the entire line. When the first installed slide wire (catheter) is not used as a check reference, it can be replaced by a floating hanging clamp.

f. Check the safety installation condition to ensure that the parallelism of the rails of the entire line and the power-consuming equipment and the straight line of the slide wire (catheter) itself is not more than 15mm.

g. Installation of the collector stack. Note the matching of the long and short legs of the catheter.

h. The final power-on operation, found that the problem was resolved immediately.

DHGJ-4-35/140 multi-tube type trolley wire installation diagram:

Floating Sphere

Floating Sphere,Brass Solid Sphere,Cpvc Solid Sphere,Stainless Steel Solid Sphere

Antong Valve Co.,Ltd , https://www.atvalveball.com