During the season of renovation, many people recently consulted for renovations, most of whom are friends of second-hand houses. Therefore, today is the first thing that should be noticed in the renovation of second-hand housing - interior decoration demolition . Demolition can be done by looking for a renovation team. You can search for water cats at the edge of the road. You can find professional dismantlers, and you can also find someone who collects waste. So, how does the interior decoration demolition charge? Next, let's take a look at it with Xiao Bian.
The demolition works in second-hand housing are generally more numerous, especially in the years of age or even more than ten years, some of the original decoration effects and styles are no longer suitable for modern people's needs, on the other hand the original structure is not too Ideally, so more parts need to be removed. Here we will talk to you about aspects that need to be taken care of in the selection of dismantling workers and the calculation methods for dismantling labor costs.
How to calculate the cost of interior decoration removal
Under normal circumstances, the cost of dismantling can be divided into two methods: the actual size of the project and the estimated cost.
Dismantling method of interior decoration 1: charge according to the actual size of the project
The demolition project can be divided into square meters, groups, and items for different projects. For example, tiles, floors, and wall removal can be calculated in square meters. Heating can be calculated by group; doors, windows, floors, and old cabinets can be charged by item. Tiles are generally about 20 yuan per square meter. The wall thickness and material are not the same and can be between 50 yuan and 100 yuan per square meter; heating can be directly dismantled for collection of waste, and can be collected without paying the demolition fee. Doors and windows are usually set at between 20 yuan and 50 yuan, but there are also free dismantling of waste products. They can be reused; floors, old furniture, and wall coverings have to be determined depending on the specific situation. Finding someone who collects firewood can save a second, and the payment method is to work after payment.
Interior Decorating Method II: Estimating, On-Site "Seeing Live Pricing
This type of fee collection is generally the method of professional dismantling teams and water cats. The demolition masters went directly to the scene to see the work, and then priced it on the spot. If the two sides negotiated well, they will be demolished at a fixed time. This kind of "looking at live pricing" is generally done after the first payment. The main difference is the addition of a middleman - construction leader.
Second-hand house interior decoration demolition is an essential part of the construction process
1. The constructor must ensure the construction safety of the dismantling staff, do not cause any safety problems due to improper safety measures, etc.; and the owner must wear a safety rope when removing the window part; must wear goggles for the cut-out construction; dismantle the dismantling of the window or balcony part Things should be avoided to fall. Adjacent walkways downstairs should be equipped with warning signs or dedicated guards; the trouble with people or cars is great.
2. Reasonable dismantlement and unscrupulous operation, minimizing the increase in investment caused by making up for the demolition; avoiding vertical knocking of the floor on the floor cutting tool will cause damage to the floor (the power tool should maintain the necessary slope, and the cross slope with the ground is not More than 45 degrees is good)
3. Finish product protection, including partitions, pipes, electric boxes, water and electricity meters, outside windows, floor drains, and drains that need to be retained; it is necessary to wrap or bind the above finished products; the eradication of walls must be thorough, but not Demolition of the main wall;
4, in the original wall surface opening hole should be used to cut hole piercing line, and then cut the method of chisel; fall dregs higher parts of the floor should be cushioned cushion or scaffolding to catch the fall; avoid large chunks of Destroy the floor slabs of concrete or bricks;
5, corridors to avoid the surrender, should be timely clean up; dismantling can not occupy the fire exits and corridors for a long time.
Summary: Many people think that secondary decoration should be more economical and simple. In fact, it is even more troublesome than the first time. We must ask a professional home improvement company to help. Otherwise, not only the high cost will leave hidden trouble for the future. Regarding the topic of interior decoration demolition , we introduced it here today and hope to help everyone.
Decoration project budget decoration decoration decoration company okay decoration materials brand home improvement decoration steps
5M Swimming Pool Spa,Fitness Swim Spa,Swimming Spa Pool,Swim Spa Pool Underground
SpaRelax Co., Ltd. , https://www.sparelaxoutdoorspa.com