There are many standards for hydropower construction. We all hope that our own hydroelectric power can meet standards and even exceed standards. This is not a simple matter, and we need the years of construction experience of hydropower masters to understand. Today we look at four hydropower construction masters who have summed up their hydropower construction tips over the years so that they can learn from them when they supervise their work.
Do not completely sealed the unused box
If the original position of the box is not used in the new design, the construction personnel will not simply completely seal it, and it will be properly retained according to the actual situation to facilitate maintenance and threading, because an excessively long line pipe will be found in practical experience. The problem is that in the future, it is impossible to completely change the line, so the proper position of the original line box is properly reserved to facilitate the smooth passage of the line for emergency use.
Balcony waterproof slope treatment
In addition to hydropower, the hydroelectrician also has a small process that involves the construction of a waterproof slope on the bottom of all sealed balconies to avoid leakage of water from subsequent balconies and balconies, and careful and thoughtful construction experience.
Tin foil separates strong and weak electricity
The strong and weak electric crossover parts are wrapped with tin foil to reduce the magnetic field interference, and the length of the tin foil at both ends of the intersection is greater than 15 cm. When the owners watch TV and make phone calls, there will be no trouble with snowflakes and noises!
Detatch socket panel installed in advance
Because the socket panel does not enter the site during general hydropower construction, and the ceiling of the kitchen has been completed during the installation of the hydropower panel in the later period, it is not convenient to install the socket panel. Therefore, this is installed in advance to avoid future troubles.
Edit reminder:
Hydropower construction can be said to be one of the most important procedures in fitting-out. Hydropower as a part of daily high utilization rate directly determines the quality of the entire renovation. If the owners do not accept it, it is best to find a friend or a supervisor to check and accept, so as to avoid any worries.
Hydropower installation of hydropower acceptance hydropower reform hydropower stage
Kitchen Faucets With Sidespray
Kitchen Faucets With Sidespray,Kitchen Faucets With Sidespray Price,Kitchen Faucets With Sidespray Product
Yuyao Zelin Sanitary Ware Co., Ltd , https://www.kitchen-sinkfaucet.com