Numbering
step
Construction team work
Owner work
Both parties coordinate their work
purchase ingredients
Note
1
Steps: Before Construction Team Enters the Site <br> Design
2
Budget price bargaining, signing contract to pay the first construction fee
3
Balcony, etc.
4
Apply for Gas Opening
5
Steps: hydropower <br>construction
6
Construction team approached to open water and electricity materials
7
Purchase of hydropower accessories
See list of hydropower materials
8
Order PPR hose
9
Jointly negotiating pipeline trends
10
Chisel wall pipe slot
11
Telephone contact PPR
12
Row of wires
13
Row PPR tube
14
Fixed electrical data specification and construction team see the electrical inventory related information and warranty card must be retained
15
Hidden project acceptance to pay the second construction fee
16
Step: Woodworking <br> <br> cabinet for the first time measurement
17
Material procurement and masonry work <br><br><br><br><br><br><br><br
See the list of woodworking materials
18
Order ceiling materials
19
Floor
Su plate
20
Door and window cover production and furniture frame completion, fixed door and sliding door construction team provide data
twenty one
Ceiling (hall and room)
twenty two
Making woodwork such as entrances and walls
twenty three
Hit the ground keel
twenty four
Flooring
25
Open bill of materials procurement (line types, door locks, glass, rails, etc.)
26
Baseboard production
27
Door installation, etc.
28
Kitchen and bathroom ceiling
It must be done after the mason is finished
29
Steps: Mason <br> Open Bill of Materials
30
Procurement Accessories and Wall Tiles, Waterproof Coatings
See mason list
31
Waterproof production
32
Wall tiles
33
Tiles
34
Purchase kitchen appliances
35
The second measurement of kitchen cabinets must provide electrical details
36
Purchasing sanitary ware and faucet
37
Step: Painter <br>Open bill of materials
See the painter's list. The woodworker will begin to enter the construction after laying the floor and making furniture.
38
Purchase of paint materials
Pay for the third project
39
Wall surface put in putty
40
Door and window cover paint
41
Grinding floor
42
Floor paint
43
Wall top latex paint
44
Steps: Plumbers <br>Open bill of materials
See luminaire fixture list before floor paint begins to enter
45
purchase materials
46
Sanitary installation
47
Cabinet installation
48
The switch is installed before the last pass of latex paint
49
Lighting installation
50
Overall Acceptance of Designers, Supervisors, Party A and Party B
51
Construction settlement
52
Step: finishing work <br> <br> cleaning work
53
Purchase curtains
54
Purchase furniture
55
Purchasing electrical appliances
56
Purchasing bedding and daily necessities
57
move
Three trees Lacquer del floor Lacquer for electrical windows Furniture latex paint Kitchen cabinets Glass bricks Cabinets Doors Glass Sliding doors Glass furniture Kitchen wall tiles Kitchen cabinet doors Floor tiles Glass doors Kitchen glass Sliding doors Bathroom doors Bathroom ceiling materials Bathroom wall tiles Bathroom ceilings Bathroom design Toilets waterproof Bathroom floor tiles bathroom sliding door
Common rail tools are specially for common rail injection system repair, it covers disassembly and assembly tools, measuring device, adaptors for different injectors, grinding machine, cleaning machine etc.
These tools meet different maintenance applications, are easy to use, and greatly improve maintenance efficiency.
Common Rail Tools,Common Rail Injector Tools,Common Rail Injector Removal Tool,Rail Pressure Tester
CHENGDU UNICO MACHINERY CO., LTD , https://www.injectortestbench.com