Clearance process

Cleaner decoration order
Numbering
step
Construction team work
Owner work
Both parties coordinate their work
purchase ingredients
Note


1
Steps: Before Construction Team Enters the Site <br> Design

2
Budget price bargaining, signing contract to pay the first construction fee

3
Balcony, etc.

4
Apply for Gas Opening

5
Steps: hydropower <br>construction


6

Construction team approached to open water and electricity materials





7


Purchase of hydropower accessories

See list of hydropower materials


8


Order PPR hose





9



Jointly negotiating pipeline trends


10

Chisel wall pipe slot





11


Telephone contact PPR





12

Row of wires





13

Row PPR tube





14


Fixed electrical data specification and construction team see the electrical inventory related information and warranty card must be retained


15



Hidden project acceptance to pay the second construction fee


16
Step: Woodworking <br> <br> cabinet for the first time measurement





17
Material procurement and masonry work <br><br><br><br><br><br><br><br

See the list of woodworking materials


18


Order ceiling materials





19


Floor


Su plate


20

Door and window cover production and furniture frame completion, fixed door and sliding door construction team provide data


twenty one

Ceiling (hall and room)






twenty two

Making woodwork such as entrances and walls





twenty three

Hit the ground keel





twenty four

Flooring





25

Open bill of materials procurement (line types, door locks, glass, rails, etc.)





26

Baseboard production





27

Door installation, etc.





28

Kitchen and bathroom ceiling


It must be done after the mason is finished


29
Steps: Mason <br> Open Bill of Materials





30


Procurement Accessories and Wall Tiles, Waterproof Coatings

See mason list


31

Waterproof production





32

Wall tiles





33

Tiles





34


Purchase kitchen appliances





35


The second measurement of kitchen cabinets must provide electrical details


36


Purchasing sanitary ware and faucet





37
Step: Painter <br>Open bill of materials

See the painter's list. The woodworker will begin to enter the construction after laying the floor and making furniture.


38


Purchase of paint materials


Pay for the third project


39

Wall surface put in putty





40

Door and window cover paint





41

Grinding floor





42

Floor paint





43

Wall top latex paint





44
Steps: Plumbers <br>Open bill of materials

See luminaire fixture list before floor paint begins to enter


45
purchase materials

46
Sanitary installation





47
Cabinet installation

48
The switch is installed before the last pass of latex paint


49

Lighting installation





50


Overall Acceptance of Designers, Supervisors, Party A and Party B


51





Construction settlement


52
Step: finishing work <br> <br> cleaning work





53
Purchase curtains





54
Purchase furniture

55
Purchasing electrical appliances

56
Purchasing bedding and daily necessities

57
move

Three trees Lacquer del floor Lacquer for electrical windows Furniture latex paint Kitchen cabinets Glass bricks Cabinets Doors Glass Sliding doors Glass furniture Kitchen wall tiles Kitchen cabinet doors Floor tiles Glass doors Kitchen glass Sliding doors Bathroom doors Bathroom ceiling materials Bathroom wall tiles Bathroom ceilings Bathroom design Toilets waterproof Bathroom floor tiles bathroom sliding door

Common Rail Tools

Common rail tools are specially for common rail injection system repair, it covers disassembly and assembly tools, measuring device, adaptors for different injectors, grinding machine, cleaning machine etc.


These tools meet different maintenance applications, are easy to use, and greatly improve maintenance efficiency.


Common Rail Tools,Common Rail Injector Tools,Common Rail Injector Removal Tool,Rail Pressure Tester

CHENGDU UNICO MACHINERY CO., LTD , https://www.injectortestbench.com