What are the construction steps of wall tiles? What are the characteristics of wall tiles?

Compared with the traditional paint wall, the tiled wall not only has a longer service life and decorative effect, but it can also reduce the burden on the decorator's cleaning and has a great response in the market. So how do you put a wall tile ? What are the points for laying a wall tile ? Let's take a look with Xiaobian!

What are the construction steps of wall tiles?

1. Primary treatment

Before laying out the wall tiles, we need to do base layer processing. Clean the dirt and stain on the surface of the base layer first, then remove the putty layer and the paint layer on the surface. At the same time, it should also check the flatness of the grass-roots level, if the grass-roots level is uneven, you still need to use cement mortar leveling, otherwise it will affect the tile paving effect.

2. Lofting and pre-paving

After the grassroots has been cleaned up, it is still not possible to lay the wall tiles directly. Instead, several lines of elevation control lines should be popped around the wall with ink lines, and a crosshair line should be popped out on the ground to control the size of each floor tile. Afterwards, the tiles are pre-paved according to the requirements of the decoration, and the effect of the decoration is checked and adjusted.

3. Modulation wall tile adhesive

Add appropriate water to the binder slurry, mix and stir them, and then leave it to stand for five minutes to ten minutes, then stir for another 1-2 minutes to start using it.

4. Clean the wall surface

After you have prepared the adhesive, you can begin to prepare the wall tiles. Before laying, clean the dust and dirt on the surface of the wall tile product. After the treatment is completed, the pre-configured slurry can be applied to the back of the tile, paying attention to the evenness and fullness of the coating when applying the slurry.

5. Laying the wall tiles

The mortar-coated wall tiles are laid according to the previously pre-paved pattern. After laying the flat walls, the rubber mortar is used to flatten and reinforce the walls. At the same time, in the process, you can also rotate the tiles a little to allow the back of the tiles to come into full contact with the slurry and blend closely.

6. Waist line

Many of them choose to use the waist line in order to increase the decorative performance of the wall. When paving the waist line, not only must maintain the consistency with the texture of the wall tile, but also leave a certain gap in order to carry out caulking or the United States seam treatment, otherwise it is easily outweighed.

7. Caulking

After 24 hours after laying the wall tiles, the prepared caulking agent or beautiful grout can be applied to the gap between the brick and the brick to prolong its service life and increase the overall appearance of the interior decoration. After the caulking process is completed, the excess caulking agent should be cleaned with a damp cloth to maintain the cleanliness of the wall surface.

Xiao Bian concludes: The above is the introduction of Xiao Bian's construction steps for sticking wall tiles . I hope to help those friends who are troubled in this area. If you still want to learn more or ask more questions about decoration, welcome to pay attention to this site!

Wall tiles

5 Inch Medium Duty Casters

1.5 inch / 125 mm Medium Duty Caster Wheel PVC/ PU / TPR
2.High quality galvanized support
3.Single wheel PVC / PU / TPR / PVC material

4.Double ball bearings


5 inch

Swivel Wheels,5 Inch Medium Duty Casters,5 Inch Medium Duty Caster Wheels,5 Inch Swivel Wheels

Yangjiang Xingyang Industry & Trade Co.,Ltd. , https://www.xycaster.com