If the bathroom is not properly waterproof, there will be a variety of drawbacks, after use for a period of time, prone to wall peeling tiles, mold and other phenomena. Then, the bathroom waterproof trap tricks are what? Here let the small series for everyone to introduce bathroom waterproof trap God skills it!
First, analyze the cause of wall leakage
First of all, we have to identify clearly what causes the seepage of the bathroom wall in order to better deal with the leakage of the bathroom wall surface. There are two kinds of water seepage situation in the general bathroom wall, one is caused by the leakage of the water pipe, and the other is caused by the leakage of the waterproof layer.
Judging the water pipe problem: We can look at the direction of the water pipe according to the construction drawing. If there is a water pipe hidden behind the water leaking place, you can turn off the water lock inside the house when you are traveling or not at home, and clear the water inside the faucet. After a while, it was found that the water traces on the wall had disappeared, which proved to be a problem with the water pipe.
Judging the problem of the waterproof layer: If there is a leak in the wall of the toilet after bathing, it is found that the leakage of the wall surface has improved after a period of interruption, which proves that there is a problem with the waterproof layer.
Second, bathroom waterproof trap God skills
Leaking water pipe
(1) We can look at the direction of the water pipes in accordance with the construction drawings. If there are water pipes in leaking places, turn off the indoor water locks and let the water in the faucet clear. If some time later, it is found that the water surface disappears. It should be a water pipe problem.
(2) Then find where the leaking point of the water pipe is concrete, and check the leaking degree. If it is not serious, it can be repaired by welding; if it is serious, the leaking section needs to be replaced.
2.Waterproof layer leakage
(1) We need to find out the possible leakage of water around us, focusing on whether there are loopholes or whether there is any break in the waterproof layer. If so, we need to find a professional person to check it out.
(2) Use tools to remove the outside tiles, find the gaps between the tiles, use water-proof plugging holes, and use cement to wipe out and apply waterproof paint on the walls.
(3) As we all know, if the waterproof height is not enough, or consider the leakage caused by mistakes, you can re-plan high tiles and re-waterproof the high walls.
The above is all about the contents of the bathroom waterproof trapping gods . I hope to help everyone. If you want to know more relevant knowledge, you can continue to pay attention to the relevant information of this website. Xiao Bian will bring more exciting content for everyone.
Advantage of Railway Concret Sleeper:
Also called :Concrete Sleeper,Railway Concrete Sleeper,Railway Concrete Slab Sleeper,Concret Sleeper For Metro
High stability
High precision of level
High requirements to track base
Less maintenance
Simple structure
Lower cost and more convenient of transportation of slab sleeper
Type |
Axle Load |
The G.W. density per year |
The highest passenger train speed |
The highest freight train speed |
Rail Type |
Gauge |
Min. curve radius |
Length |
Width | Height | Weight |
Rail base slope |
||
End |
center | End | center | |||||||||||
(t) | (Mt.km/km) | (km/h) | (km/h) | (kg/m) | (mm) | (m) | (mm) | (mm) | (mm) | (kg) | ||||
YII-F | 25 | 25~50 | ≤120 | ≤80 | 60/50 | 1435 | ≥300 | 2500 | 294.5 | 244.5 | 230 | 165 | 251 | 1:40 |
XII | 25 | 25~50 | ≤160 | ≤80 | 60/50 | 1435 | ≥300 | 2500 | 306.5 | 246.5 | 235 | 175 | 285 | 1:40 |
IIZQ-C | 25 | 25~50 | ≤160 | ≤80 | 60/50 | 1435 | ≥300 | 2500 | 274.5 | 274.5 | 230 | 221.5 | 280 | 1:40 |
IIIa | 25 | >30 | 200 | 90 | 70/60 | 1435 | ≥300 | 2600 | 320 | 280 | 260 | 185 | 370 | 1:40 |
IIIb | 25 | >30 | 200 | 90 | 70/60 | 1435 | ≥350 | 2600 | 320 | 280 | 235 | 185 | 370 | 1:40 |
IIIc | 25 | >30 | 200 | 90 | 70/60 | 1435 | ≥300 | 2600 | 320 | 280 | 260 | 185 | 370 | 1:40 |
IIIQ | 25 | 25~50 | 120~160 | 90 | 75/60 | 1435 | ≥300 | 2600 | 320 | 280 | 240 | 195 | 370 | 1:40 |
IIIQa | 25 | 25~50 | 200 | 90 | 60/50 | 1435 | ≥300 | 2600 | 320 | 320 | 240 | 240 | 406 | 1:40 |
IIIQc | 25 | 25~50 | 200 | 90 | 60/50 | 1435 | ≥300 | 2600 | 320 | 320 | 240 | 240 | 406 | 1:40 |
KZ | 25 | 25~50 | ≤160 | ≤80 | 60/50 | 1435 | ≥300 | 2500 | 542 | 542 | 205 | 155 | 548 | 1:40 |
701 | 25 | 25~50 | 200~250 | 60 | 1435 | ≥300 | 2400 | 288 | 255 | 190 | 1:40 | |||
Wenfu railI |
25 |
25~50 | ≥200 | 60 | 1435 | ≥300 | 2400 | 288 | 205 | 189 | 1:40 | |||
SK-1 | 25 | 25~50 | 200~250 | 60 | 1435 | ≥300 | 2400 | 314 | 225 | 227 | 1:40 | |||
SK-2 | 25 | 25~50 | 200~250 | 60 | 1435 | ≥300 | 2400 | 314 | 275.5 | 242 | 1:40 | |||
Plate 1 | 1435 | |||||||||||||
Plate 2 | 1435 | 1:04 |
Concrete Sleeper,Railway Concrete Sleeper,Railway Concrete Slab Sleeper,Concret Sleeper For Metro
TAICANG ZHONGBO RAILWAY FASTENING CO., LTD. , https://www.railfastener.com