Small concrete mixing plants are widely used in projects that involve field construction operations such as highways, bridges, power stations, and dams. At the same time can also be based on the special requirements of users to restructure to meet user needs. Then when the concrete mixing station is installed, it is time to commission the equipment. If the problem arises, how can the correct debugging be done? Zhengzhou Haohai Machinery supports you.
When debugging the control system, first reset the emergency button, close the power switch in the electrical cabinet, turn on the circuit breakers in each branch, switch the power switch in the control circuit, and switch the power switch in the control room in turn to observe whether the electrical system has abnormal phenomena. If there is an immediate check; open the button of each motor, the steering of the test motor is correct, if it is incorrect, it should be adjusted immediately; start the air pump of the small concrete mixing station, and start the air control doors according to the button labeling after the pressure reaches the requirements. Whether the action is flexible; zero and adjust the sensitivity of the computer; check the air compressor switch is normal, the barometer display is correct, the safety valve pressure adjustment to the standard range; the mixer test run to see if abnormal sound, each Whether the components can work properly; when the belt conveyor is commissioned, it needs to be operated. During the running process, check whether each idler is flexible. Observe the belt carefully, and do not have any sway, run, edging, slipping, deformation, etc.; When commissioning the concrete batching machine, it is necessary to press the ingredients button more than once to see if it is flexible and can be configured The accuracy is then referenced in the debug dose.
When debugging the control system, first reset the emergency button, close the power switch in the electrical cabinet, turn on the circuit breakers in each branch, switch the power switch in the control circuit, and switch the power switch in the control room in turn to observe whether the electrical system has abnormal phenomena. If there is an immediate check; open the button of each motor, the steering of the test motor is correct, if it is incorrect, it should be adjusted immediately; start the air pump of the small concrete mixing station, and start the air control doors according to the button labeling after the pressure reaches the requirements. Whether the action is flexible; zero and adjust the sensitivity of the computer; check the air compressor switch is normal, the barometer display is correct, the safety valve pressure adjustment to the standard range; the mixer test run to see if abnormal sound, each Whether the components can work properly; when the belt conveyor is commissioned, it needs to be operated. During the running process, check whether each idler is flexible. Observe the belt carefully, and do not have any sway, run, edging, slipping, deformation, etc.; When commissioning the concrete batching machine, it is necessary to press the ingredients button more than once to see if it is flexible and can be configured The accuracy is then referenced in the debug dose.
1M Mini Measuring Tape,Small Retractable Tape Measure,Precision Tape Measure,Tape Measure Scale
SHANGQIU CHAOYUE MEASURING TOOLS CO., LTD , https://www.calibrateds.com