Decoration should be prepared in advance 8 items can not be ignored

At the same time of hydropower reform, we must first determine whether to install a gas water heater or an electric water heater. If you need to install a gas water heater, you must first find a designer to install gas water heaters to see where your home's gas water heater is located in a suitable place, how to take the pipeline, so that at the same time the hydropower reform, decoration workers can do it together.

Designers of general brand gas water heaters need to receive a door-to-door fee of 10 yuan, but their suggestions are more instructive because there are many standards for installing gas water heaters. Designers will often determine the location of the water heater, tell the decoration worker how to take the cold water and hot water pipes of the water heater, and the flue exhaust duct. Because it is hot during use, it cannot be too close to the smoke duct of the cooker hood. Generally, the flue of the range hood is plastic, and it is easily burned or burned by the exhaust pipe of the water heater.

If the natural gas or gas pipeline has only one gas port, the gas or natural gas installed in the gas water heater will need to be remodeled to make two gas outlets. This change can only be done by gas or gas companies in the community, and it can usually be done in half a day.

If you install an electric water heater, you do not need to be so troublesome. After the hydropower reform is completed, you can directly install the water heater in the bathroom.

The first measurement of the cabinet is fine

At the same time, the initial measurement of the cabinets was carried out because the cabinets involved some of the kitchen's pipes (gas gas pipes are absolutely not packaged). After confirming the manufacturer, an order must be signed and a deposit of 100 to 300 yuan must be paid in advance. This deposit will be returned after signing the contract.

After signing the order, the customer can request the measurement designer to take the measurement. A three-party client, a survey designer, and a home improvement company must work together to plan the layout of the kitchen and determine the location of waterways, circuits, and appliances. The survey designer should give the waterway, circuit diagrams, and meet the construction standards.

When waterways, circuits, and tiles are all in place, accurate measurements must be made again so that the dimensions of the cabinets ensure that the entire kitchen is tightly fitted. Pay attention to whether there is enough space in the cooking area, the washing area, the storage area, and the cooking area. The height of the cabinet and the height of the countertop meet the actual needs of ergonomics and cooking. Whether the space outside the cabinet can guarantee normal operation requirements.

After the design plan is finalized, a supply contract must be signed. When signing the contract, it is best to specify the manufacturer's promised warranty time and customer response time limit in the contract. Once the manufacturer can not solve the problem in time, this can restrict the manufacturer's behavior.

Haier Water heaters Water heaters for gas stoves Gas water heaters Cooker hoods Furnishings Design room Electric water heaters Kitchen cabinets Kitchen doors Kitchen doors Bathroom doors Bathroom doors Bathroom dimensions Bathroom furniture Bathroom tiles

Bathroom Tub Faucet

Floor Mounted Tub Filler with Hand Shower with 360 Degree Swivel.The hoses come with a nylon-braided exterior that protects against chemical corrosion (commonly caused by detergent) and rusting. Easy operation single handle design allows flow rate and temperature control in single hand. Handheld Shower head and high arch 360 degree swivel bath tub faucet change in one second through diverting valve knob.

Bathroom Tub Faucet,Clawfoot Tub Faucet,Jetted Freestanding Bathtub,Freestanding Tub Faucet

HESHAN CAIZUN SANITRAYWARE CO.,LTD , https://www.caizunsanitaryware.com