At the beginning of April, it entered the deep spring season. The warmth and humidity are the main climate characteristics during this period. Some experts reminded that in wet weather decoration, many things need special attention. In the previous issue, we introduced the raw materials issue. In this issue, we continued to introduce issues that should be paid special attention to in construction.
>>> Spring decoration needs precautions Experts remind to pay attention to four aspects
1 Remember to leave a seam on the wooden floor
Due to thermal expansion and contraction, wooden floors will swell to varying degrees during the summer months. Therefore, if you are renovating a wooden floor, you must ask the installer to leave enough expansion joints, so that when the summer comes, The floor will not tilt. At the same time, also pay attention to keep the indoor air dry. In hot springs, the paint dries slowly after brushing. After the paint absorbs moisture in the air, it will produce a layer of matte. Therefore, it is generally necessary to use a drying agent to make the paint dry faster. Similarly, latex paint is not easy to dry, it will produce a mildew, which will require dehumidification after construction to completely remove the moisture in the air. Finally, when the weather condition allows, the room with wooden floor should pay attention to the ventilation of the windows, so that the paint, cement and floor moisture will slowly dissipate.
2 Renovation should be waterproof
Many families in the renovation have to knock down the original bathroom tiles and lay new tiles. Springs with a large temperature difference between day and night also make water proofing particularly important, so this time the waterproof decoration steps can not be ignored.
After the floor of the bathroom is flattened and the waterproof treatment is performed, the leakage of the waterproof coating due to uneven thickness can be avoided. The joints should be filled with paint and cement brush, and the materials should be uniform. It is worth noting that the wall treatment is also very important, in the general waterproof treatment, the wall is also about to do a 30 cm high waterproof coating to prevent the accumulation of water infiltration walls; the ground and wall similar to the water pipe is also Also do waterproofing to prevent water from penetrating the walls. The seam between the bathroom wall and the ground and the joint between the pipeline and the ground are often an error-prone part. During the construction process, the construction personnel must be supervised to make the work fine.
Zhao Taiyu, supervising engineer of Woodpecker Decoration Supervision Company, suggested that after the owner puts in the waterproof layer and lays a new floor tile, waterproof experiment should be done first in the bathroom. The owner can block all the water outlets of the toilet and enclose the obstacles around the height of 20 centimeters in the doorway. In such cases, the water can be stored in the bathroom for 24 hours. After 24 hours, check whether there is any leakage. This 24-hour waterproofing experiment is necessary and is currently being promoted in the industry because it can help us find the problem of the waterproof layer. If there is a quality problem in the waterproofing project, water stains can hit the next room. It will leak downstairs and cause serious damage to your home and neighbors.
3 Coating construction must first be damp-proof
During the renovation process, there are a large number of places where painting is needed. In order to save costs and save costs, some small construction teams may dispense with painting the primary moisture-proof primer during coating construction. The owners need to pay attention.
In addition, due to the wet weather, the paint is not easy to completely dry, so after the brushing should pay attention to ventilation, fighting for the paint to get the maximum degree of drying.
Entrance decoration study decoration paint paint cement room interior decoration floor tile bathroom waterproof bathroom tile bathroom floor tile bathroom door tile adhesive floor tile
Elevator Traction Machine,Gearless Traction Elevator,Geared Traction Elevator,Gearless Elevator Motor
MAURER TECHNOLOGIES CO., LTD. , https://www.maurer-elevator.com