Demolition and Reform of the Wall in the Early Stage of the Construction Record the Owner's Diary

Owner Readme:

For the things that have already been decided, I like quick fixes. From the signing of the design contract to the signing of the formal construction contract, it will be just two short weeks. On March 18th, the official start of the day was for the designer, project manager, and plumber Xiao Wang. Wang Wei, director of Dianwang Engineering, Wang Yan, Product Manager of Qijia, and Wang Jianli, the third-party supervisor, all attended the meeting, especially Wang Yan and Wang Jianli of Qijia. They waited early in the downstairs, earlier than me, praised. a bit!

【Starting on March 18】

The Record of Wall Demolition and Modification in the Early Stage of Construction The Owner's Diary Follows Up

Code Wang sent a red envelope, not bad. Firecrackers ~

The Record of Wall Demolition and Modification in the Early Stage of Construction The Owner's Diary Follows Up

Wang Jianli accounted for the project manager's notes

The Record of Wall Demolition and Modification in the Early Stage of Construction The Owner's Diary Follows Up

Designer's location for wall removal

The first day of construction was basically a tripartite exchange and signing. Then the designer marked the location of the wall and the next day was officially started!

【March 19】

On March 19, although I knew that the wall was demolition, I still shocked me after I arrived at the scene! When I went in the evening, I met two masters of the wall. They were about to get the job. I simply asked about the situation of the day and explained that they must pay attention to safety.

Because it was the demolition of the wall, it did not go for several days. After going on March 25, it was found that the progress of the demolition of the wall was too slow. Basically, the wall was demolished on the 19th. It was only part of the garbage that had been transported, and the gas meter was not packaged. The project schedule was not posted. At that time, he was called upon by the emergency and project manager, Supervisor Wang Wei and designer Xiao Wang. Their response rate is still relatively fast. Project manager Zhou Kun promised that I would complete the demolition tomorrow and expressed my apologies and promised to make up for it later in the progress of the project. Since this is the case, I will see their actions!

The Record of Wall Demolition and Modification in the Early Stage of Construction The Owner's Diary Follows Up

The Record of Wall Demolition and Modification in the Early Stage of Construction The Owner's Diary Follows Up

The Record of Wall Demolition and Modification in the Early Stage of Construction The Owner's Diary Follows Up

There is a lot less rubbish, but the wall that was not demolished on the 19th is still there.

Window house glass space paint glass brick cabinet door glass sliding door partition wall cabinet red brick floor tile glass door design of the study bathroom door bathroom door size bathroom size bathroom design bathroom sliding door cloakroom size balcony study

1 234 Next> Total 4 Pages
Page to page
Function assignPage() { var page = $('#page_val').val(); if (/_\d+\.html$/.test(location.href)) { location.href = location.href.replace( /_\d+\.html/, ((page == 1) && 1? '' : '_' + page) + '.html') } else if(/\/\d+\.html$/.test (location.href)) { location.href = location.href.replace(/(\d+)\.html/, ((page == 1) && 1? '$1' :'$1_' + page) + ' .html') } } $(function(){ $('#page_form').submit(function() { assignPage() return false; }) $('#page_btn').click(function(){ assignPage( ); return false; }) }) See full story

Compression Springs

Compression Springs,Big Wire Compression Spring,Flocking Compression Spring

Compression Springs ,Stampings,Extension Springs Co., Ltd. , http://www.ns-springs.com