Wooden door installation instructions and precautions Wooden door installation knowledge 1, installation conditions (1) The wooden door must use the installation method of the reserved hole, it is strictly prohibited to install the edge of the side of the practice.
(2) The wooden door must be installed after the installation of the hole in the groundwork (such as: floor tiles, stone), and after the wall putty is finished and polished (the wall must be affixed to the hole in the stone wall, all holes must be attached to the hole Side) for installation work.
(3) The humidity of the wall of the installation hole shall be less than 25%. If the humidity is greater than 25%, a moisture-proof insulation layer shall be prepared on the wall.
(4) The installation site environment is clean, no messy, no crossover operations.
2. Install tool hammers, woodworking hammers, planes, flat files, fine-tooth saws (hacksaws), screwdrivers, squares, tape measures, hanging hammers, level gauges, drills, hole saws, pokes, drills of corresponding specifications.
3ã€Installation material iron piece connector, 60 iron nails, 25 and 20 self-tapping screws, 502 glue, towel or cotton yarn, wood shavings, small wood, pig hair brush, styrofoam, opal glue, door lock, hinge, Door suction, wall moisture barrier material.
Wooden door installation sequence 1. Assemble the door cover.
First, find out the door sleeve and the vertical plate. According to the back number, it should be on the same plane and the interface should be glued.
2, install the door.
Put the assembled door cover into the door hole as a whole. Use a small wooden bar to fix the door cover around. The two sides of the door cover should be on the same plane with the wall. Then check whether the whole door cover is vertical to the floor. Whether the two corners of the board are at a right angle or not, whether the door panel is bent or not, twist the iron pieces at both ends so as to wrap the wall.
3, install the door leaf.
Open the page slot first. The distance between the hinge slot and the two ends of the door leaf should be 1/10 of the height of the door.
4, install the lock.
After loading, check whether the door leaf and the door lock switch are flexible, whether the left seam is flexible, and whether the left seam meets the specifications.
5, install door line.
Cut the door sleeve line with right-angled edge into a 45-degree angle, trim it with a carpenter, insert the right-angle edge into the groove of the door pocket, and use the floor glue to stick the door sleeve wire to the door jamb plate.
6. Install the door stopper in the corresponding position.
Function assignPage() { var page = $('#page_val').val(); if (/_\d+\.html$/.test(location.href)) { location.href = location.href.replace( /_\d+\.html/, ((page == 1) && 1? '' : '_' + page) + '.html') } else if(/\/\d+\.html$/.test (location.href)) { location.href = location.href.replace(/(\d+)\.html/, ((page == 1) && 1? '$1' :'$1_' + page) + ' .html') } } $(function(){ $('#page_form').submit(function() { assignPage() return false; }) $('#page_btn').click(function(){ assignPage( ); return false; }) }) See full story
(2) The wooden door must be installed after the installation of the hole in the groundwork (such as: floor tiles, stone), and after the wall putty is finished and polished (the wall must be affixed to the hole in the stone wall, all holes must be attached to the hole Side) for installation work.
(3) The humidity of the wall of the installation hole shall be less than 25%. If the humidity is greater than 25%, a moisture-proof insulation layer shall be prepared on the wall.
(4) The installation site environment is clean, no messy, no crossover operations.
2. Install tool hammers, woodworking hammers, planes, flat files, fine-tooth saws (hacksaws), screwdrivers, squares, tape measures, hanging hammers, level gauges, drills, hole saws, pokes, drills of corresponding specifications.
3ã€Installation material iron piece connector, 60 iron nails, 25 and 20 self-tapping screws, 502 glue, towel or cotton yarn, wood shavings, small wood, pig hair brush, styrofoam, opal glue, door lock, hinge, Door suction, wall moisture barrier material.
Wooden door installation sequence 1. Assemble the door cover.
First, find out the door sleeve and the vertical plate. According to the back number, it should be on the same plane and the interface should be glued.
2, install the door.
Put the assembled door cover into the door hole as a whole. Use a small wooden bar to fix the door cover around. The two sides of the door cover should be on the same plane with the wall. Then check whether the whole door cover is vertical to the floor. Whether the two corners of the board are at a right angle or not, whether the door panel is bent or not, twist the iron pieces at both ends so as to wrap the wall.
3, install the door leaf.
Open the page slot first. The distance between the hinge slot and the two ends of the door leaf should be 1/10 of the height of the door.
4, install the lock.
After loading, check whether the door leaf and the door lock switch are flexible, whether the left seam is flexible, and whether the left seam meets the specifications.
5, install door line.
Cut the door sleeve line with right-angled edge into a 45-degree angle, trim it with a carpenter, insert the right-angle edge into the groove of the door pocket, and use the floor glue to stick the door sleeve wire to the door jamb plate.
6. Install the door stopper in the corresponding position.
Decoration construction knowledge decoration steps decoration notes wooden door switch paint decorative floor tiles
1 2 Next> Total 2 Page
Page to page
Api Acetaminophen,Active Ingredient Acetaminophen,White Acetaminophen
Lemandou Chemicals Co., Ltd. , http://www.hbfertilizers.com